Welcome to H Harvi Engineering
Home > MV/HV/LV Distribution System
Our MV/HV/LV Distribution System division provides comprehensive solutions for electrical distribution systems, including design, supply, installation, and commissioning of MV, HV, and LV panels, cables, and other equipment. We offer:
– Distribution system design and engineering (11 KV to 33KV)
– Supply and installation of MV, HV, and LV panels
– Cable laying and jointing
– Testing and commissioning of distribution systems
– Turnkey solutions for electrical distribution projects, including project management, engineering, and construction
Our team of experts has extensive experience in MV/HV/LV distribution system projects, ensuring reliable and efficient power distribution. We utilize advanced technologies and equipment to ensure the highest quality and safety standards.
CEO – Ravindrakumar Patel
CEO - Manan Thakkar
At H-Harvi Engineering, Our services are designed to ensure safety, reliability, and optimal performance at every stage of a project. Turnkey Projects, O&M Services, Utility Services, Cable Testing, Design and Consultancy, Biogas, Liasioning and EV Charging Station.
At H-Harvi Engineering, we proudly serve a diverse range of industries and clients, delivering tailored electrical engineering and infrastructure solutions that meet the unique to medium demands of each sector. Our experience spans multiple domains — from heavy electrical industry to commercial enterprises, direct consumer, private companies.
Yes, H-Harvi Engineering provides comprehensive turnkey EPC (Engineering, Procurement, and Construction) solutions for electrical infrastructure projects.
We take complete responsibility for the project lifecycle — from initial concept and detailed engineering to procurement, installation, testing, commissioning, and final handover. Our turnkey approach EHV cable system design, MV/HV/LV Distribution Network Design, Consultant for Electrical Projects & 66KV and 11KV solar line System Design.
At H-Harvi Engineering, quality and safety are foundational principles embedded in every stage of our operations. We follow a structured, engineering-driven approach to ensure every project meets the highest standards of performance, compliance, and reliability.
At H-Harvi Engineering, our project execution timeline is carefully structured to ensure efficient delivery while maintaining the highest standards of quality and safety. The exact duration depends on project scope, voltage level, site conditions, and regulatory authorities which in coordinate with project.
Commissioning Date - 24.03.2024
Plant Capacity (MW) - 5 MW(AC), 6.75 MW(DC)
Transmission Line - OH Line
Length of Line - 4.3000 (KM)
Commissioning Date - 24.01.2024
Plant Capacity (MW) - 10 MW(AC), 13 MW(DC)
Transmission Line - OH Line
Length of Line - 3.05000 (KM)
Commissioning Date - 24.12.2025
Plant Capacity (MW) - 10 MW(AC), 13 MW(DC)
Transmission Line - UG Cable
Length of Line - 4.33500 KM
Call