Welcome to H Harvi Engineering
Home > EHV/HV/MV/LV Connection
Our liaisoning team assists clients in obtaining electrical connections for EHV, HV, MV, and LV power projects, ensuring compliance with regulatory requirements and industry standards.
Scope of Services:
– Preparation and submission of applications for electrical connections in allied departments
– Coordination with regulatory authorities and utility companies
– Facilitation of site inspections and surveys
– Obtaining necessary clearances and permits
– Liaison with authorities for grid connectivity and power evacuation
CEO – Ravindrakumar Patel
CEO - Manan Thakkar
At H-Harvi Engineering, Our services are designed to ensure safety, reliability, and optimal performance at every stage of a project. Turnkey Projects, O&M Services, Utility Services, Cable Testing, Design and Consultancy, Biogas, Liasioning and EV Charging Station.
At H-Harvi Engineering, we proudly serve a diverse range of industries and clients, delivering tailored electrical engineering and infrastructure solutions that meet the unique to medium demands of each sector. Our experience spans multiple domains — from heavy electrical industry to commercial enterprises, direct consumer, private companies.
Yes, H-Harvi Engineering provides comprehensive turnkey EPC (Engineering, Procurement, and Construction) solutions for electrical infrastructure projects.
We take complete responsibility for the project lifecycle — from initial concept and detailed engineering to procurement, installation, testing, commissioning, and final handover. Our turnkey approach EHV cable system design, MV/HV/LV Distribution Network Design, Consultant for Electrical Projects & 66KV and 11KV solar line System Design.
At H-Harvi Engineering, quality and safety are foundational principles embedded in every stage of our operations. We follow a structured, engineering-driven approach to ensure every project meets the highest standards of performance, compliance, and reliability.
At H-Harvi Engineering, our project execution timeline is carefully structured to ensure efficient delivery while maintaining the highest standards of quality and safety. The exact duration depends on project scope, voltage level, site conditions, and regulatory authorities which in coordinate with project.
Commissioning Date - 24.03.2024
Plant Capacity (MW) - 5 MW(AC), 6.75 MW(DC)
Transmission Line - OH Line
Length of Line - 4.3000 (KM)
Commissioning Date - 24.01.2024
Plant Capacity (MW) - 10 MW(AC), 13 MW(DC)
Transmission Line - OH Line
Length of Line - 3.05000 (KM)
Commissioning Date - 24.12.2025
Plant Capacity (MW) - 10 MW(AC), 13 MW(DC)
Transmission Line - UG Cable
Length of Line - 4.33500 KM
Call
Location